|
Category
|
Type
|
Timeline
|
|
Session A: Office Materials and Support Services
|
||
|
Hotels, RV parks and housing
|
Services
|
June 2017
|
|
Office and cleaning supplies
|
Materials
|
June 2017
|
|
Office furniture
|
Materials
|
June 2017
|
|
Water and ice
|
Services
|
June 2017
|
|
Catering
|
Materials
|
June 2017
|
|
Session B: Construction Materials and Services
|
||
|
Fuel, oil and lubricants
|
Materials
|
June 2017
|
|
Porta-johns
|
Services
|
June 2017
|
|
Personal protective equipment and health, safety and environmental supplies
|
Materials
|
June 2017
|
|
Trash and recycling service
|
Services
|
June 2017
|
|
Welding gases and rods
|
Materials
|
June 2017
|
|
Electrical supplies
|
Materials
|
June 2017
|
|
Equipment and tool repairs
|
Services
|
June 2017
|
|
Hose fabrication and supply
|
Materials
|
June 2017
|
|
Lumber and hardware
|
Materials
|
June 2017
|
|
Light fabrication, machining and assembly
|
Services
|
October 2017
|
|
Paints, adhesives and sealants
|
Materials
|
TBD
|
|
Nuts, bolts and gaskets
|
Materials
|
January 2018
|
|
Concrete supply and grout
|
Materials
|
TBD
|
|
Laydown and storage
|
Services
|
TBD
|
|
Session C: Subcontracts (work performed on site)
|
||
|
Site security guards
|
Subcontracts
|
April 2017
|
|
Temporary construction facilities (trailers)
|
Subcontracts
|
April 2017
|
|
Heavy industrial HVAC
|
Subcontracts
|
TBD
|
|
Concrete pumping
|
Subcontracts
|
May 2017
|
|
Civil site preparation, e.g., earthwork, dirt movement, leveling land, vegetation removal, etc.
|
Subcontracts
|
April 2017
|
|
Rebar installation
|
Subcontracts
|
TBD
|
|
Roofing and siding
|
Subcontracts
|
January 2018
|
|
Elevator installation
|
Subcontracts
|
TBD
|
|
Paving and grading
|
Subcontracts
|
January 2018
|
|
Piping and equipment insulation
|
Subcontracts
|
March 2018
|
|
Gas line cleaning
|
Subcontracts
|
January 2018
|
|
Fencing (permanent and temporary)
|
Subcontracts
|
April 2017
|
|
Steam blows (blowing steam through pipe to remove debris, cleaning lines or new installations)
|
Subcontracts
|
March 2018
|
|
Fiber optic terminations (specialized equipment to connect systems)
|
Subcontracts
|
March 2018
|
|
Emergency notification and public address system
|
Subcontracts
|
March 2018
|
|
Telephone and business local area network (LAN)
|
Subcontracts
|
March 2018
|
###